Energy BOE Importance: 3/10

Acciona withdraws its application to build the 'La Solana' 51 MW photovoltaic solar plant in Ayora (Valencia)

06 Jun 2026 Effective: 06 Jun 2026 0 views
Who is affected:
Corporación Acciona Eólica, SL and administrations of Valencia and Albacete involved

Summary

Corporación Acciona Eólica withdraws from its 51 MW hybrid photovoltaic plant project in Ayora (Valencia). The Directorate General for Energy Policy formally accepts the abandonment of the file.

Detailed analysis PRO

The Directorate General for Energy Policy and Mines accepts the withdrawal by Corporación Acciona Eólica, SL, of its authorization request for the 'La Solana' photovoltaic plant of 50.98 MWp in Ayora (Valencia), submitted in December 2022. The project was part of a group of hybrid plants processed jointly, which was se…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Crear cuenta gratis Ver planes PRO

Full official title

Resolución de 27 de abril de 2026, de la Dirección General de Política Energética y Minas, por la que se acepta el desistimiento formulado por Corporación Acciona Eólica, SL, de la solicitud de autorización administrativa previa, autorización administrativa de construcción, declaración de impacto ambiental y declaración en concreto de utilidad pública de la infraestructura híbrida fotovoltaica «La Solana», de 50,98 MWp, y su infraestructura de evacuación, en Ayora (Valencia).

Related regulations