Energy BOE Importance: 4/10

Environmental approval of a 54 MW hybrid solar plant next to a wind farm in Albacete

12 Jun 2026 Effective: 12 Jun 2026 24 views
Who is affected:
Promoter Acciona Eólica, Castilla-La Mancha administrations and landowners in El Bonillo (Albacete)

Summary

The environmental impact statement is approved for a 54 MW photovoltaic installation in El Bonillo (Albacete) that will hybridize with the Cabeza Morena-Dueñas wind farm. The project was modified to protect ecological corridors and wildlife.

Detailed analysis PRO

The Directorate General for Quality and Environmental Assessment issues a favorable environmental impact statement for a 54.33 MW photovoltaic plant promoted by Corporación Acciona Eólica, SLU in El Bonillo, Albacete. The installation will hybridize with the existing 50 MW wind farm, sharing evacuation infrastructure t…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Crear cuenta gratis Ver planes PRO

Full official title

Resolución de 25 de mayo de 2026, de la Dirección General de Calidad y Evaluación Ambiental, por la que se formula declaración de impacto ambiental del proyecto «Instalación híbrida fotovoltaica "FV hibridación parque eólico Cabeza Morena-Dueñas", y sus infraestructuras de evacuación, en la provincia de Albacete».

Sponsored space
Sponsor the Energy category

Your brand in front of thousands of businesses and freelancers tracking the legal changes in your sector.

I want to sponsor it

Related regulations