Energy BOE Importance: 3/10

Authorization of 53 MW photovoltaic solar plant with storage in Rueda de Jalón (Zaragoza)

18 Apr 2026 Effective: 31 Mar 2026 6 views
Who is affected:
Molinos del Ebro SA company and renewable energy sector in Aragón

Summary

Molinos del Ebro SA is authorized to build a 53.32 MW solar plant with 5 MW battery storage in Zaragoza, which will be combined with an existing wind farm of 49.95 MW.

Detailed analysis PRO

The Dirección General de Política Energética y Minas grants prior administrative authorization to Molinos del Ebro SA to construct the El Llano Photovoltaic Solar Plant of 53.32 MW together with a battery energy storage system of 5 MW in Rueda de Jalón, Zaragoza. The project will be hybridized with the existing El Llan…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Crear cuenta gratis Ver planes PRO

Full official title

Resolución de 31 de marzo de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Molinos del Ebro, SA, autorización administrativa previa para el módulo solar fotovoltaico "Central Solar Fotovoltaica El Llano" de 53,32 MW de potencia instalada y para el módulo de almacenamiento con baterías "Almacenamiento Hibridación El Llano" de 5 MW de potencia instalada, y su infraestructura de evacuación, en Rueda de Jalón (Zaragoza), para su hibridación con el parque eólico existente "El Llano" de 49,95 MW.

Related regulations