Energy BOE Importance: 3/10

Authorization to close and dismantle the high-voltage power line Morella-La Plana in Castellón

22 Jun 2026 Effective: 22 Jun 2026 5 views
Who is affected:
Red Eléctrica de España, SAU, and municipalities in Castellón affected by the route

Summary

Red Eléctrica de España is authorized to close and dismantle the 400 kV power line between Morella and La Plana in Castellón, 65 km long, to replace it with a new double-circuit line.

Detailed analysis PRO

The Directorate General for Energy Policy and Mines grants Red Eléctrica de España, SAU, authorization to close and dismantle the 400 kV single-circuit overhead line Morella-La Plana, 65.2 km long, in the province of Castellón. The project is included in the Transmission Network Development Plan 2021-2026 and is a prer…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Crear cuenta gratis Ver planes PRO

Full official title

Resolución de 3 de junio de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Red Eléctrica de España, SAU, autorización de cierre para la línea aérea de transporte de energía eléctrica a 400 kV, simple circuito, Morella-La Plana, en la provincia de Castellón.

Sponsored space
Sponsor the Energy category

Your brand in front of thousands of businesses and freelancers tracking the legal changes in your sector.

I want to sponsor it

Related regulations