Public utility declaration for Helena Solar 12 solar park of 46.80 MW in Maqueda (Toledo)
30 May 2026
Effective: 30 May 2026
5 views
Who is affected:
Landowners in Maqueda (Toledo) and developer company Solaria
Summary
Solaria is granted the public utility declaration to build a 46.80 MW photovoltaic park in Maqueda, Toledo. This allows the expropriation of land necessary for the installation.
Detailed analysis
PRO
The Directorate General for Energy Policy and Mines grants Solaria Promoción y Desarrollo Fotovoltaico the public utility declaration for the Helena Solar 12 photovoltaic park of 46.80 MW in Maqueda (Toledo). This declaration enables the company to initiate forced expropriation procedures or impose easements on affecte…
Full official title
Resolución de 15 de mayo de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Solaria Promoción y Desarrollo Fotovoltaico, SLU, la declaración, en concreto, de utilidad pública, para el parque fotovoltaico Helena Solar 12, de 46,80 MW de potencia instalada, y su infraestructura de evacuación, en Maqueda (Toledo).