Authorization of 45 MW solar plant with batteries in Rueda de Jalón (Zaragoza) to hybridize with existing wind farm
04 May 2026
Effective: 10 Mar 2026
29 views
Who is affected:
Molinos del Ebro SA and municipality of Rueda de Jalón (Zaragoza)
Summary
Molinos del Ebro SA is authorized to install a 45 MW photovoltaic module and 5 MW batteries in Zaragoza, combining them with an already existing 50 MW wind farm.
Detailed analysis
PRO
The Dirección General de Política Energética y Minas grants prior administrative authorization to Molinos del Ebro SA to build the El Tollo photovoltaic module (45 MW) and a battery storage system (5 MW) in Rueda de Jalón, Zaragoza. The project will be hybridized with the already operational El Tollo wind farm of 50 MW…
Full official title
Resolución de 10 de marzo de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Molinos del Ebro, SA, autorización administrativa previa para el módulo fotovoltaico El Tollo, de 45 MW de potencia instalada, el módulo de almacenamiento con baterías El Tollo, de 5 MW de potencia instalada, y sus infraestructuras de evacuación, para hibridación con el parque eólico existente El Tollo, de 50 MW, en Rueda de Jalón (Zaragoza).