Energy BOE Importance: 3/10

Authorization for 38.5 MW storage battery alongside solar plant in Badajoz

13 Jun 2026 Effective: 13 Jun 2026 31 views
Who is affected:
Enel Green Power España Solar 1 SLU and local administrations of Casas de Don Pedro (Badajoz)

Summary

Enel Green Power is authorized to add a 38.5 MW battery system to its Castilblanco solar park in Badajoz, forming a 50 MW hybrid installation.

Detailed analysis PRO

The Directorate General for Energy Policy and Mines grants prior administrative authorization to Enel Green Power España Solar 1 to install a 38.5 MW battery storage module hybridized with the Castilblanco Solar photovoltaic park (42.299 MW), resulting in a 50 MW hybrid installation in Casas de Don Pedro (Badajoz). The…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Crear cuenta gratis Ver planes PRO

Full official title

Resolución de 20 de mayo de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Enel Green Power España Solar 1, SLU, autorización administrativa previa para el módulo de almacenamiento «Castilblanco Batería», de 38,5 MW de potencia instalada, para su hibridación con el parque solar fotovoltaico existente «Castilblanco Solar», de 42,299 MW de potencia instalada, y para una parte de su infraestructura de evacuación, conformando una instalación híbrida de 50 MW de potencia instalada, en Casas de Don Pedro (Badajoz).

Sponsored space
Sponsor the Energy category

Your brand in front of thousands of businesses and freelancers tracking the legal changes in your sector.

I want to sponsor it

Related regulations