Energy BOE Importance: 3/10

Authorization for 38.5 MW energy storage battery in Badajoz to hybridize with existing solar plant

13 Jun 2026 Effective: 13 Jun 2026 20 views
Who is affected:
Enel Green Power España Solar 1, SLU and local administrations of Casas de Don Pedro (Badajoz)

Summary

Enel Green Power is authorized to add a 38.5 MW battery system to its Valdecaballero solar park in Badajoz, forming a hybrid installation of 50 MW.

Detailed analysis PRO

The General Directorate of Energy Policy and Mines grants prior administrative authorization to Enel Green Power España Solar 1, SLU to install a 38.5 MW battery storage module in Casas de Don Pedro (Badajoz), hybridizing it with the existing Valdecaballero Solar photovoltaic park of 42.299 MW. The resulting hybrid ins…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Crear cuenta gratis Ver planes PRO

Full official title

Resolución de 20 de mayo de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Enel Green Power España Solar 1, SLU, autorización administrativa previa para el módulo de almacenamiento «Valdecaballero Batería», de 38,5 MW de potencia instalada, para su hibridación con el parque solar fotovoltaico existente «Valdecaballero Solar», de 42,299 MW de potencia instalada, y para una parte de su infraestructura de evacuación, conformando una instalación híbrida de 50 MW de potencia instalada, en Casas de Don Pedro (Badajoz).

Sponsored space
Sponsor the Energy category

Your brand in front of thousands of businesses and freelancers tracking the legal changes in your sector.

I want to sponsor it

Related regulations