Authorization to modify an underground power line for an 85.80 MW solar plant in Soria
02 Apr 2026
Effective: 25 Feb 2026
17 views
Who is affected:
Promoter company CSF Continua Anguita SL and landowners affected in Soria
Summary
CSF Continua Anguita SL is authorized to modify the 30 kV underground power line of its photovoltaic plant in Arcos de Jalón and Medinaceli (Soria). The works are declared of public utility.
Detailed analysis
PRO
The Dirección General de Política Energética y Minas grants CSF Continua Anguita SL prior administrative and construction authorization to modify the 30 kV underground power line evacuating energy from the CSF Anguita photovoltaic installation, with 85.80 MW of installed capacity in the Soria municipalities of Arcos de…
Full official title
Resolución de 25 de febrero de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a CSF Continua Anguita, SL, autorización administrativa previa y autorización administrativa de construcción para la modificación de la línea eléctrica subterránea a 30 kV que forma parte de la infraestructura de evacuación de la instalación fotovoltaica CSF Anguita, de 85,80 MW de potencia instalada, en Arcos de Jalón y Medinaceli (Soria), y se declara, en concreto, la utilidad pública.