Energy BOE Importance: 3/10

121.5 MW 'El Espino' solar park in Madrid cancelled following unfavorable environmental impact assessment

10 Jun 2026 Effective: 10 Jun 2026 35 views
Who is affected:
Renewable energy developers, photovoltaic investors and municipalities of Velilla de San Antonio and Loeches

Summary

Falck Renewables Power 3 withdraws from constructing a 121.5 MW solar park in Velilla de San Antonio and Loeches (Madrid) after receiving an unfavorable environmental impact assessment. The Directorate General for Energy Policy formally accepts the withdrawal.

Detailed analysis PRO

Falck Renewables Power 3, SL withdraws its application for prior administrative authorization for the 'El Espino' photovoltaic solar park of 121.5 MWp/100 MWn in Madrid, initiated in December 2020. The trigger was the unfavorable environmental impact assessment issued in June 2024 by the Directorate General for Quality…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Crear cuenta gratis Ver planes PRO

Full official title

Resolución de 22 de mayo de 2026, de la Dirección General de Política Energética y Minas, por la que se acepta el desistimiento de Falck Renewables Power 3, SL, de autorización administrativa previa del parque solar fotovoltaico «El Espino de 121,5 MWp/100 MWn» y su infraestructura de evacuación asociada, en Velilla de San Antonio y Loeches (Madrid).

Sponsored space
Sponsor the Energy category

Your brand in front of thousands of businesses and freelancers tracking the legal changes in your sector.

I want to sponsor it

Related regulations