Correction of errors in the authorization of the Galatea II solar plant of 92.4 MW in Madrid
23 Apr 2026
Effective: 16 Apr 2026
44 views
Who is affected:
Promoting company Green Capital Development 57 SLU and landowners affected in Madrid
Summary
Errors are corrected in the resolution that authorized the construction of the Galatea II photovoltaic plant in Pezuela de las Torres and Corpa (Madrid). The installation has 92.4 MW of power and was declared of public utility.
Detailed analysis
PRO
This resolution corrects material errors detected in the prior administrative authorization and construction permit granted in March 2025 to Green Capital Development 57, SLU for the Galatea II photovoltaic plant. The installation, with 92.4 MW of power, is located in the Madrid municipalities of Pezuela de las Torres …
Full official title
Resolución de 16 de abril de 2026, de la Dirección General de Política Energética y Minas, por la que se corrigen errores en la de 17 de marzo de 2025, por la que se otorga a Green Capital Development 57, SLU, autorización administrativa previa de las modificaciones y autorización administrativa de construcción para la instalación fotovoltaica Galatea II, de 92,4 MW de potencia instalada, y su infraestructura de evacuación, en Pezuela de las Torres y Corpa (Madrid), y se declara, en concreto, su utilidad pública.