Energy BOE Importance: 3/10

Authorization denied for a 55 MW wind farm in Burgos by Arbequina Wind

04 Apr 2026 Effective: 19 Mar 2026 10 views
Who is affected:
Arbequina Wind, SL, renewable energy developers and the wind energy sector in Burgos

Summary

The Dirección General de Política Energética y Minas rejects Arbequina Wind's application to build the Satola wind farm in Burgos. The 55 MW project has not obtained the required prior administrative permit.

Detailed analysis PRO

The Dirección General de Política Energética y Minas has dismissed the prior administrative authorization application submitted by Arbequina Wind, SL, for the installation of the Satola wind farm, with a capacity of 55 MW, along with its evacuation infrastructure, in the province of Burgos. This resolution means the pr…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Crear cuenta gratis Ver planes PRO

Full official title

Resolución de 19 de marzo de 2026, de la Dirección General de Política Energética y Minas, por la que se desestima la solicitud de Arbequina Wind, SL, de autorización administrativa previa de la instalación eólica Satola, de 55 MW de potencia instalada, y de su infraestructura de evacuación, en la provincia de Burgos.