Energy BOE Importance: 3/10

Iberdrola obtains authorization to install solar panels next to a wind farm in Toledo forming a 40 MW hybrid plant

11 Jun 2026 Effective: 11 Jun 2026 44 views
Who is affected:
Iberdrola Renovables de Castilla-La Mancha and local administrations of Villacañas (Toledo)

Summary

The Ministry authorizes Iberdrola to add 30.9 MW of solar capacity to the Sierra del Romeral wind farm in Villacañas (Toledo), creating a 40 MW hybrid installation with strict environmental conditions.

Detailed analysis PRO

The Directorate General for Energy Policy and Mines grants Iberdrola Renovables de Castilla-La Mancha prior administrative authorization to hybridize the Sierra del Romeral wind farm (31.45 MW) with a photovoltaic module of 30.933 MW, resulting in a hybrid installation limited to 40 MW of power at the connection point.…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Crear cuenta gratis Ver planes PRO

Full official title

Resolución de 4 de mayo de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Iberdrola Renovables de Castilla-La Mancha, SA, autorización administrativa previa para el módulo solar fotovoltaico «Hibridación Sierra del Romeral», de 30,933 MW de potencia instalada, para su hibridación con el parque eólico existente «Sierra del Romeral», de 31,45 MW de potencia instalada, y sus infraestructuras de evacuación, conformando una instalación híbrida de 40 MW de potencia instalada, en Villacañas (Toledo).

Sponsored space
Sponsor the Energy category

Your brand in front of thousands of businesses and freelancers tracking the legal changes in your sector.

I want to sponsor it

Related regulations