Summary

Sun Capital 2000 has withdrawn its application to install a 71.4 MW photovoltaic plant in municipalities in Málaga. The Directorate General for Energy Policy formally accepts this withdrawal.

Detailed analysis PRO

The Directorate General for Energy Policy and Mines accepts the withdrawal submitted by Sun Capital 2000, SL, regarding the application for prior administrative authorization, construction authorization and declaration of public utility for the FV Zalea Ampliación photovoltaic plant, 71.4 MW, located in Álora, Pizarra …

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Crear cuenta gratis Ver planes PRO

Full official title

Resolución de 24 de marzo de 2026, de la Dirección General de Política Energética y Minas, por la que se acepta el desistimiento formulado por Sun Capital 2000, SL, de la solicitud de autorización administrativa previa, autorización administrativa de construcción y declaración, en concreto, de utilidad pública, para la instalación fotovoltaica «FV Zalea Ampliación», de 71,4 MW de potencia instalada, y su infraestructura de evacuación, en Álora, Pizarra y Casarabonela (Málaga).